CF10_1: Logistics and infrastructure

Logi­stics und Infra­struc­ture CF10_1 Project dura­tion: 10/2021–09/2024 Part­ners: Aim of project: In order to be able to use green ammonia as a trans­port and storage solu­tion for green hydrogen, an effi­cient infra­struc­ture and a logi­stics concept geared to the specific frame­work condi­tions are required. The aim of the “Logi­stics and Infra­struc­ture” sub-project is ther­e­fore to…

CF10_2: Flexible ammonia fuelling system

Flexible NH3 Refue­ling System CF10_2 Project Dura­tion: 04/2021–03/2023 Part­ners: With the support of the asso­ciated part­ners: Aim of project: In the sub-project “Flexible NH3 refue­ling system”, non-statio­nary options for supp­lying ships with ammonia as fuel are being deve­loped. Based on data on the current supply of fossil fuels, the temporal and spatial demand for green…

CF10_3: Shore-side ammonia refuelling system

On-Shore NH3 Refue­ling System CF10_3 Project dura­tion: 04/2021–03/2024 Part­ners: Aim of project: In order to take over ammonia imports as base load supply for large consu­mers, a shore-side tran­ship­ment faci­lity for the future supply of ships (loading of trans­port ships as well as bunke­ring of ammonia-fueled ships) is desi­gned in the subpro­ject CF10_3 of the…

CF10_4: Ammonia-fuelled hydrogen filling station

Ammonia to hydrogen fueling station CF10_4 Project dura­tion: 01.04.2022 to 30.03.2025 Part­ners: Asso­ciated Part­ners: Aim of project: The rese­arch project has the goal of deve­lo­ping a plant for the produc­tion of hydrogen suitable for refue­ling from green ammonia. Cost-effec­tive fine puri­fi­ca­tion tech­no­lo­gies for the product gas opti­miza­tion of NH3 crackers are thus an important key…