CF06_2: Development of a concept for a functional model for the commercial decentralised production of green ammonia

Green ammonia CF06_2 Project costs: 502 T€ Project period: 05/2020–06/2022 Part­ners: Objec­tive: The objec­tive of project CF06_2 is to develop a concept for the indus­trial produc­tion of green ammonia with 16 MW installed capa­city from wind and solar and 5 MW from elec­tro­lysis at a site in the region. The plant will be desi­gned to…

CF06_1: Development of a decentralised generation technology for green ammonia to store renewable energy

Green ammonia CF06_1 Project costs: 714 T€ Project period: 04/2020–10/2022 Part­ners: KIT Objec­tive: In project CF06_1, a test labo­ra­tory for the deve­lo­p­ment of new systems for decen­tra­lised ammonia synthesis is being set up on the YARA premises using the exis­ting infra­st­ruc­ture. The Univer­sity of Rostock, a project partner, will confi­gure and test three possible types…

CF09: GreenBalticCruising: Development of a concept for the implementation of CAMPFIRE technologies for zero-emission marine mobility in the Baltic Sea Region

Marine propul­sion CF09 Project costs: 605 T€ Project period: 10/2020–10/2022 Part­ners: Objec­tive: The use of ammonia as a new energy source on the Baltic Sea requires a detailed consi­de­ra­tion of the Baltic Sea coun­tries, their port struc­tures and ship­ping connec­tions with nort­hern Germany. In addi­tion to deve­lo­ping poten­tial ammonia-based ferry lines in the Baltic Sea…

CF08_1: Development of a concept for the emission-free operation of an inland vessel powered by ammonia

Marine propul­sion CF08_1 Project costs: 1.279 T€ Project period: 09/2020–08/2022 Part­ners: Objec­tive: The objec­tive of CF08 projects is to outfit an inland vessel as a ‘test vehicle’ that uses an ammonia-powered internal combus­tion engine, a process that includes the instal­la­tion of the necessary tank, safety and peri­pheral systems onboard the vessel. The ammonia-powered propul­sion system…

CF07_1: Development of a functional model for an ammonia-powered sport yacht with a hybrid system consisting of a solid oxide fuel cell and engine

Marine propul­sion CF07 Project costs: 1.470 T€ Project period: 09/2020–08/2022 Part­ners: Objec­tive: Sailing yachts have always used wind for propul­sion. Today, the inte­rior fittings offered by most modern sailing yachts meet high stan­dards and use electrical energy for navi­ga­tion, safety, secon­dary propul­sion and auxi­liary equip­ment onboard the ship. This energy is provided by fossil-based primary…